摘要
为建立数字矿山的管理体系,利用3DMine矿业工程软件,构建了罗河铁矿钻孔数据库、地表模型、地层模型、矿体模型、岩体模型、井巷模型、块模型等三维可视化模型,对指导矿山设计、生产等日常管理工作及提升工作效率具有重要意义。
In order to establish a digital mine management system,using 3DMine mining engineering software,a three-dimensional visualization model of Luohe Iron Mine drilling database,surface model,stratum model,ore body model,rock mass model,well lane model and block model were constructed to guide the mine.It is of great significance to design and produce daily management tasks and improve work efficiency.
作者
朱宗杰
刘成皓
郏威
王忠强
王世松
Zhu Zongjie;Liu Chenghao;Jia Wei;Wang Zhongqiang;Wang Shisong(Luohe Mining Co.,Ltd.,Anhui Ma-steel)
出处
《现代矿业》
CAS
2019年第5期48-52,共5页
Modern Mining