王庄煤矿+540m水平北栗回风井投运方案分析 被引量:4

Analysis on the Operation Plan of Beili Return Air Well in the +540 m Level of Wangzhuang Coal Mine
下载PDF
导出
摘要 通风系统改造过程,新风井投运对原有通风系统影响较大,新风井投运过程保障矿井通风系统稳定可靠运行,对煤矿安全生产至关重要。为确定王庄煤矿+540m水平北栗回风井投运方案,通过建立、利用矿井通风管理信息系统,对该回风井投运方案进行模拟分析,确定了北栗回风井投运方案,论证了投运方案对整个通风系统的影响,保障了通风系统的稳定可靠运行。 In the process of renovation of ventilation system,the commissioning of new wind shaft has a great impact on the original ventilation system.The operation of the new wind shaft ensures the stable and reliable operation of the mine ventilation system,which is essential for the safe production of coal mines.In order to determine the operation plan of the+35 m horizontal Beili return air well in Wangzhuang Coal Mine,through the establishment and utilization of the mine ventilation management information system,the simulation analysis of the return air well operation plan was carried out,and the operation plan of the Beili return air well was determined.It demonstrates the impact of the operation plan on the entire ventilation system and ensures the stable and reliable operation of the ventilation system.
作者 刘军 Liu Jun(Wangzhuang Coal Mine,Lu'an Environmental Energy Development Co.,Ltd.)
出处 《现代矿业》 CAS 2019年第5期116-119,共4页 Modern Mining
关键词 通风系统 回风井 风井投运 仿真分析 Ventilation system Return air shaft Wind well commissioning Simulation analysis
  • 相关文献

参考文献5

二级参考文献22

共引文献47

同被引文献9

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部