摘要
通过同条件下现浇和新型装配式混凝土框架边节点的静载试验分析,并与有限元计算结果进行对比,得出该新型装配式混凝土框架边节点的承载力略低于现浇边节点,但延性优于现浇节点。此外,在新型装配式混凝土框架梁、柱连接处应采取措施抵抗受力时产生的局部压应力,避免接触位置过早发生压碎现象。
Through static load test analysis of cast-in-place and new-type precast concrete frame side joints under the same condition, and comparison with the results of finite element analysis, it is concluded that the bearing capacity of the new-type precast concrete frame side joints is slightly lower than that of cast-in-place side joints, but the ductility is better than that of cast-in-place joints. In addition, measures should be taken to resist the local compressive stress at the connection of the new-type prefabricated concrete frame beam and column and to avoid premature crushing at the contact position.
作者
沈天宇
吴竞
章玲达
余昶昊
SHENG Tianyu;WU Jing;ZHANG Lingda;YU Changhao(Department of Civil Engineering, Tongji Zhejiang College, Zhejiang Jiaxing 314051, China)
出处
《低温建筑技术》
2019年第5期51-53,63,共4页
Low Temperature Architecture Technology