摘要
为了有效控制山区高速公路工程造价,降低项目建设成本,论文结合即将建设的溧阳至宁德高速公路(G4012)浙江景宁至文成段工程项目,从线路设计方面分析影响工程造价的技术因素,提出线路设计在工可、初设、施工图3个设计阶段的控制造价的实施策略,使省内山区高速公路在路线设计阶段的造价控制与管理质量得到提高。
In order to effectively control the cost of expressway engineering in mountainous area,reduce the construction cost of project,this paper combined with the construction of Jingning to Chengdu section in Zhejiang of Liyang to Ningde expressway project(G4012),analyzes the technical factors affecting project cost from the aspect of overall design,This paper puts forward the implementation strategy of controlling the cost of line design in the three stages of engineering feasibility study,preliminary design and construction drawing design,so as to improve the quality of the cost control and management of mountainous expressway in the province in the stage of route design.
作者
叶小华
YE Xiao-hua(Design Branch of Zhejiang Jiaogong Group Co.Ltd.,Hangzhou 310051,China)
出处
《工程建设与设计》
2019年第11期169-171,共3页
Construction & Design for Engineering
关键词
山区高速公路
线路设计
控制造价
实施策略
expressway in mountainous area
route design
control the cost
implementation strategy