摘要
以某连拱隧道为实例,通过优化设计单侧壁导坑开挖断面,详细阐述了扩大单侧壁导坑的三导洞开挖施工方法及措施,从而改善了有限空间的作业环境,达到安全快速施工的目的,经济效益显著。
Taking a multi-arch tunnel as an example,through optimizing the excavation fracture surface of the single-side guide pit,the construction method and measures of the three-side guide tunnel for expanding the single-side guide pit are elaborated in detail,so as to improve the operating environment in the limited space,achieve the purpose of safe and rapid construction,and achieve significant economic benefits.
作者
徐丙义
XU Bing-yi(First Engineering Co.Ltd.of China Railway Major Bridge Engineering Group Co.Ltd.,Zhengzhou 450000,China)
出处
《工程建设与设计》
2019年第11期226-228,共3页
Construction & Design for Engineering
关键词
连拱隧道
单侧壁导坑法
三导洞
multi-arch tunnel
single-sided heading method
three-heading tunnel