摘要
单桩基础方案为风机基础的代表方案,因此对单桩基础的研究拥有很高的工程意义。本文以江苏近海某风电场项目为研究背景,介绍在单桩施工过程中起关键作用的沉桩定位平台,详细说明该平台的设计、安装以及施工工程,并分析在借助定位平台下单桩定位过程中的控制措施。为我国海上单桩风机基础的设计和施工提供指导依据.
The single pile foundation scheme is the representative one of wind turbine foundation, therefore it has high engineering significance for the research of the single pile foundation. In this article, an offshore wind farm project in Jiangsu as the research background, which has played a key role in the construction process of piling positioning platform in single pile. It also introduces the detail design of this platform, installation and construction engineering, and analysis control measures in the process of single pile positioning by using pile positioning platform. This technique provides a guiding basis for the design and construction of offshore single pile wind turbine in China.
作者
季晓强
JI Xiaoqiang(Jiangsu Longyuan Offshore Wind Power Co., Ltd., Nantong 226007, China)
出处
《风力发电》
2018年第4期38-42,共5页
Wind Power
关键词
海上风电
单桩基础
钢管桩
沉桩平台
offshore wind power
The single pile foundation
Steel pipe pile
piling positioning platform