盾构下穿地铁区间及出入口施工方案探讨 被引量:1

Discussion on Construction Scheme of Shield Tunnel Crossing Metro Section and Entrance and Exit
下载PDF
导出
摘要 万家丽路220kV电力隧道工程,隧道全长6609.007m,该隧道需要穿越地铁3号线、5号线、财富名园、利慈医院等建构筑物。文章对穿越这些地段的重难点进行了分析,并提出了相应的控制措施。研究成果可为该工程施工和今后运营提供技术支持。 The 220 kV power tunnel project of Wanjiali Road is 6609.007m in length.The tunnel needs to pass through metro lines 3,5,Fortune Garden and other buildings away from the hospital.In this paper,the key and difficult points of traversing these areas were discussed and analyzed,and the corresponding control measures were put forward.The research results can provide technical support for the construction and future operation of the vessel.
作者 杨冰清 傅鹤林 熊翠玲 林锐 YANG Bing-qing;FU He-lin;XIONG Cui-ling;LIN Rui(Changsha Municipal Bureau of Engineering,Changsha,Hunan 410013,China;Central South University,Changsha,Hunan 410075,China)
出处 《企业技术开发》 2019年第5期9-13,共5页 Technological Development of Enterprise
基金 国家自然科学重点基金资助课题“城市盾构隧道结构安全风险控制机理与方法”(51538009) 长沙科技局课题“富水砂卵石地层中电力隧道盾构下穿敏感建构筑物扰动效应及控制方法”(SZ201525-ZX11)
关键词 盾构 穿越 地铁 敏感建构筑物 措施 Shield Crossing Subway Sensitive buildings Measures