摘要 Pre-grouting ahead of tunnels has three main functions:to control water inflow into the tunnel,to limit groundwater drawdown above the tunnel,and to make tunnelling progress more predictable since rock mass quality is effectively improved.It helps to avoid settlement damage caused by consolidation of clay deposits beneath built-up areas,since towns tend to be built where terrain is more flat,due to the clay deposits.There are so many instances of settlement damage that the profession needs to take note of the need for high-pressure pre-grouting,to use micro-cements and micro-silica additives.The use of highpressure injection may cause joint jacking,but this is local in extent when the rapid pressure decay away from an injection hole is understood.This effect is variable and depends on the geometrical parameters of the joints.This pressure-decay advantage must not be violated by maintaining high pressure when grout flow from the injection hole has ceased.The latter can cause damage to the grouting already achieved.Simplified methods of estimating mean hydraulic apertures(e)from Lugeon testing are described,and from more sophisticated three-dimensional(3D)permeability measurement.The estimation of the larger mean physical joint apertures(E)is based on the joint roughness coefficient(JRC).Comparison is then made with the empirical aperture-particle size criterion E>4d95,where d95 represents almost the largest cement particle size.Depending on joint set orientations and on the available micro-cements,the decision must be made of which range of pre-injection pressure should be aimed for,using successive reductions of the water-cement ratio w/c.More simple estimation of permeability,also with depth dependence,can be made with the empirical link between a modified rock mass quality Q and permeability,which is termed QH2O.The value of this parameter can be based on core-logging or intunnel face logging.The 3D before-and-after-grouting permeability measurements have been used to justify the quantification of rock mass quality Q-parameter improvement,and the consequent increases in expected P-wave velocity and deformation modulus,for application in dam foundation treatment and its monitoring. Pre-grouting ahead of tunnels has three main functions: to control water inflow into the tunnel, to limit groundwater drawdown above the tunnel, and to make tunnelling progress more predictable since rock mass quality is effectively improved. It helps to avoid settlement damage caused by consolidation of clay deposits beneath built-up areas, since towns tend to be built where terrain is more flat, due to the clay deposits. There are so many instances of settlement damage that the profession needs to take note of the need for high-pressure pre-grouting, to use micro-cements and micro-silica additives. The use of highpressure injection may cause joint jacking, but this is local in extent when the rapid pressure decay away from an injection hole is understood. This effect is variable and depends on the geometrical parameters of the joints. This pressure-decay advantage must not be violated by maintaining high pressure when grout flow from the injection hole has ceased. The latter can cause damage to the grouting already achieved. Simplified methods of estimating mean hydraulic apertures(e) from Lugeon testing are described, and from more sophisticated three-dimensional(3 D) permeability measurement. The estimation of the larger mean physical joint apertures(E) is based on the joint roughness coefficient(JRC).Comparison is then made with the empirical aperture-particle size criterion E > 4 d95, where d95 represents almost the largest cement particle size. Depending on joint set orientations and on the available micro-cements, the decision must be made of which range of pre-injection pressure should be aimed for,using successive reductions of the water-cement ratio w/c. More simple estimation of permeability, also with depth dependence, can be made with the empirical link between a modified rock mass quality Q and permeability, which is termed QH2 O. The value of this parameter can be based on core-logging or intunnel face logging. The 3 D before-and-after-grouting permeability measurements have been used to justify the quantification of rock mass quality Q-parameter improvement, and the consequent increases in expected P-wave velocity and deformation modulus, for application in dam foundation treatment and its monitoring.
出处 《Journal of Rock Mechanics and Geotechnical Engineering》 CSCD 2019年第3期576-597,共22页 岩石力学与岩土工程学报(英文版)
  • 相关文献

同被引文献37

引证文献5

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部