6Yang Y, Xu C, Xu G, et al. A new conceptual cold-end design of boilers for coal-fired power plants with waste heat recovery [ J]. Energy Conversion and Management, 2015,89 : 137-146.
7Yuan Y, Lu Y, Bao H, et al. Investigation of a Heat Pipe Heat Exchanger Integrated with a Water Spray for the Heat Recovery from Boil Exhaust Gas[ J]. Energy Procedia, 2014,61: 2141- 2144.
8Terhan M, Comakli K. Design and economic analysis of a flue gas condenser to recover latent heat from exhaust flue gas [ J ]. Applied Thermal Engineering, 2016,100 : 1007-1015.