摘要
二维地震勘探观测系统设计时,满覆盖次数理论设计应该为常数,均匀分布,但当最小偏移距大于0.5倍道距时,满覆盖区域覆盖次数理论设计可能出现变化现象。通过对此现象发生的原理分析、总结,最终得出了满覆盖区域覆盖次数理论设计稳定时影响满覆盖次数的3个关键因素,即最小偏移距、炮间距和接收道数,及其对应的关系,在实际应用中得到了较好的效果。
The theoretical design of full fold number should be a constant, distributed uniformly in the geometry design of 2D seismic survey. The fold number maybe change in the full fold area when the minimum offset is more than half of receiver interval. The paper obtains the relationship about the minimum offset, source point interval and the number of active channels by analyzing and concluding the principles appeared in the stable period of the theoretical design of full fold area, achieving good results in the actual application.
作者
曹雄伟
许凤
张学银
崔宏良
王鹏
司亚
祝杨
刘洋
谢廷益
Cao Xiongwei;Xu Feng;Zhang Xueyin;Cui Hongliang;Wang Peng;Si Ya;Zhu Yang;Liu Yang;Xie Tingyi(BGP International,CNPC,Zhuozhou Hebei 072750,China;BGP GRI,CNPC,Zhuozhou Hebei 072750,China;Huabei Geophysical Exploration Department of BGP,CNPC,Renqiu Hebei 062555,China;BGP Production Management Department,CNPC,Zhuozhou Hebei 072750,China;BGP Equipment,CNPC,Zhuozhou Hebei 072750,China;Acquisition Technique Support of BGP,CNPC,Zhuozhou Hebei 072750,China)
出处
《工程地球物理学报》
2019年第3期321-328,共8页
Chinese Journal of Engineering Geophysics