本文针对背靠背(BTB)启动机组时损毁一次电气设备的问题,对背靠背启动过程进行技术改造,提出相应的技术改造方案,并对改造方案进行说明。
In this paper,for the problem of damage to the primary electrical equipment during the back-to-back start-up of the unit,the back-to-back starting process is technically modified,and the corresponding technical transformation plan is proposed,and the transformation plan is explained.