摘要
本文主要介绍“奥炉改造工程”阳极炉工序自设计到试生产阶段出现的部分问题及其优化改造措施,旨在为新项目建设及类似问题的处理提供参考。
This paper mainly introduces some problems and optimization and transformation measures from the design to the trial production stage of the “Ausmelt Reconstruction Engineering” anode furnace process,aiming at providing reference for the construction of new projects and the treatment of similar problems.
作者
曾庆康
金泽志
ZENG Qing-kang;JIN Ze-zhi(Tongling Nonferrous Metals Group Co.,Ltd. AnHui Tongling 244000)
出处
《世界有色金属》
2019年第6期15-18,共4页
World Nonferrous Metals
关键词
环集烟罩
操作平台
出铜溜槽
圆盘浇铸机
Ring set hood
Operating platform
Copper chute
Disc casting machine