智能变电站模块化设计研究 被引量:5

Research on Modular Design of Intelligent Substation
下载PDF
导出
摘要 采用模块化、智能化组合式电气设备,通过工厂化加工,按功能单元组装,现场安装便利,节省现场二次接线,实现“即插即用”,从而实现变电站建设真正的全工厂预制现场组装。对于进一步缩短工期,降低建设成本,提高电网工程的建设和管理效率具有重要意义。 The modularized and intellectualized combined electrical equipment is assembled by functional plant and is processed by factory processing.The field installation is convenient and it saves on-secondary connection which achieves pluging and playing. The real factory prefabrication on-site assembly of substation construction can be realized which is of great significance for shortening the construction period, reducing the construction cost and improving the efficiency of the construction and managing the power grid project.
作者 王庆义 王新明 WANG Qingyi;WANG Xinming(Shenyang Electric Power Survey and Design Institute Co.,Ltd.,Shenyang,Liaoning 110020,China;Liaoning Planning and Designing Insititute of Post and Telecommunication Co.,Ltd.,Shenyang,Liaoning 110179,China)
出处 《东北电力技术》 2019年第4期12-15,24,共5页 Northeast Electric Power Technology
关键词 模块化 智能化 预制 modularization intellectualization prefabrication
  • 相关文献

参考文献6

二级参考文献41

共引文献275

同被引文献29

引证文献5

二级引证文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部