期刊文献+

现代大型斜拉桥索道管精密定位方法研究 被引量:1

A Comprehensive Study of Precise Position Method for Cableway Pipe of Modern Large Cable Stayed Bridge
下载PDF
导出
摘要 论述了大型斜拉桥高塔柱上索道管锚垫板与出壁口中心点位的精密测定方法,概述了索道管安装测量定位的一般流程,详细介绍了全站仪自由设站法和间接高差传递法分别精确测定索道管测控点平面坐标与高程的过程及计算方法,并进行了相应的精度分析。理论与实践均证明,本文提出的方法与一般的极坐标测量法相比,索道管安装测控精度更高,测控更加方便、快捷、灵活,可广泛应用于现代斜拉桥索道管和钢锚梁安装定位中。 In this paper, the precise position method for the center point of cable duck’s anchor plate and wall outlet of large cable stayed bridge is discussed;The general process of measurement and location of cableway pipe installation is summarized;The plane coordinate and elevation of cable duck’s observe and control point are determined by the total station’s free station method and indirect height difference transfer method respectively. So this paper also introduced the process and calculation method and analyzed the corresponding accuracy. The theory and practice have proved that the method proposed in this paper is more accurate and easy to measure and control than the general polar coordinate measuring method, so it is recommended to be popularized and applied in the installation and positioning of the cable pipe and steel anchor beam of modern cable-stayed bridges.
作者 潘国歌 刘成龙 曹思语 PAN Guoge;LIU Chenglong;CAO Siyu(Faculty of Geosciences and Environmental Engineering, Southwest Jiaotong University, Chengdu 611756, China;State-province Joint Engineering Laboratory of Spatial Information Technology of High-Speed Rail Safety, Southwest Jiaotong University, Chengdu 611756, China;Wuhan No.14 Middle School, Wuhan 430060, China)
出处 《测绘与空间地理信息》 2019年第6期86-89,92,共5页 Geomatics & Spatial Information Technology
基金 “长江学者和创新团队发展计划”项目(“PCSIRT”)资助
关键词 索道管 钢锚梁 自由设站 间接高差传递 安装测控 cable duct steel anchor beam free station indirect height difference transfer installation measurement and control
  • 相关文献

参考文献4

二级参考文献17

共引文献44

同被引文献3

引证文献1

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部