摘要
对长钢炼铁厂9号高炉铁口喷溅情况进行原因分析,采取相应措施进行治理。经过十个多月的治理,喷溅逐步消除,高炉恢复正常生产。
The causes of nozzle splashing of No. 9 BF in Changgang ironworks are analyzed, and corresponding measures are taken to control it. After more than ten months of treatment, the splash was gradually eliminated and the blast furnace resumed normal production.
作者
刘辉
Liu Hui(Shougang Changzhi Steel&Iron Co.,Ltd.,Changzhi Shanxi 046031)
出处
《山西冶金》
CAS
2019年第2期90-91,共2页
Shanxi Metallurgy
关键词
高炉
铁口
喷溅
压浆
blast furnace
taphole
splashing
grouting