期刊文献+

特高压直流接地极对西二线管道的干扰研究 被引量:12

Interference of UHV DC Grounding Electrode with Second Pipeline of West-east Gas Pipeline
原文传递
导出
摘要 分析了酒泉-湖南±800 kV特高压直流接地极对西气东输二线管道的影响,选取了受干扰程度较为严重的管段进行了管道电位、电流密度以及腐蚀速率的检测。结果表明,接地极运行时,约157 km管道处于欠保护状态,108 km管道处于过保护状态;管道受到接地极的干扰时,两个监测点的电流密度分别达到-37.93和-78.60 A/m^2,部分管段腐蚀速率分别达到0.496和0.54 mm/a,远高于标准允许值0.01 mm/a。 Ultra-high-voltage DC(UHV DC) grounding poles can cause interference with buried metal pipelines during discharge. The interference can cause potential abnormalities so that to make the pipelines in danger. The influence of the ±800 k V UHV DC grounding pole of Jiuquan-Hunan UHV transmission line on the pipelines of the second line of the West-East Gas Pipeline was analyzed, especially for a selected pipeline section, which suffered from severe disturbances in terms of the pipeline potential,current density and corrosion rate. It reveals that during discharging of the grounding electrode, about 157 km of the selected pipeline is under-protected, while the other 108 km of the pipeline is over-protected. When the pipeline is disturbed by the grounding electrode, the current densities of the two desired monitoring points reach-37.93 and -78.60 A/m^2 respectively, correspondingly, the corrosion rate of the pipe sections reached 0.496 and 0.54 mm/a, far higher than the standard allowable value of 0.01 mm/a.
作者 朱钰 陈友俊 赵康 周彬 王立航 张波 侯世颖 葛彩刚 ZHU Yu;CHEN Youjun;ZHAO Kang;ZHOU Bin;WANG Lihang;ZHANG Bo;HOU Shiying;GE Caigang(China Petroleum Western Pipeline Company,Jiuquan 735000,China;Beijing Safetech Pipeline Co.Ltd.,Beijing 100083,China)
出处 《腐蚀科学与防护技术》 CAS CSCD 北大核心 2019年第3期355-359,共5页 Corrosion Science and Protection Technology
关键词 特高压直流接地极 杂散电流 ER腐蚀探头 电流密度 UHV DC grounding electrode stray current ER corrosion probe current density
  • 相关文献

参考文献15

二级参考文献172

共引文献375

同被引文献158

引证文献12

二级引证文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部