摘要
装配整体式混凝土剪力墙结构已普遍应用于各大基础住宅建设工程中。装配整体式剪力墙结构相较于传统的建造方式,有着诸多显著优势,例如可进行标准化生产和安装,深度契合国家节能减排的要求,工期进一步缩短等,同时兼具现浇整体式结构和预制装配式结构的优点。论文结合上海市奉贤区南桥镇D-01-13地块一期工程二标段房建项目施工,阐述了装配整体式剪力墙结构施工工艺、施工控制要点及施工时需注意事项,本工程充分利用构件工厂化生产的优势,搭配应用装配整体式剪力墙施工技术,加快了施工进度,装配式建筑现场木模板消耗量明显降低,减少了施工废弃物的排放。
Assembled integral shear wall structure has been widely used in major residential construction projects. Compared with the traditional construction method, the assembled integral shear wall structure has many obvious advantages, such as standardized production and installation, in-depth conformity with the national requirements of energy saving and emission reduction, shorter construction period, and so on. At the same time, it has the advantages of cast-in-place integral structure and prefabricated assembled structure. Combining with the construction of the second tender section of the first stage project of D-01-13 block in Nanqiao Town, Fengxian District, Shanghai, this paper expounds the construction technology, key points of construction control and matters needing attention in construction of the assembled integral shear wall structure. This project makes full use of the advantages of component factory production and applies the construction technology of the assembled integral shear wall, which speeds up the construction progress and accelerates the construction site of the assembled integral shear wall. The consumption of wood formwork is obviously reduced, and the discharge of construction waste is reduced.
作者
张营
ZHANG Ying(China Railway 18 Bureau Group Co., Ltd., Tianjin 300222, China)
出处
《河北地质大学学报》
2019年第3期82-85,共4页
Journal of Hebei Geo University
关键词
预制装配整体式剪力墙结构
施工关键技术
整体装配施工
prefabricated assembled integral shear wall structure
key construction technologies
integral assemblyconstruction