期刊文献+

桥式车站前期预留工程包容性研究

Study on Inclusiveness of Reserved Project in the Early Stage of Bridge-style Station
下载PDF
导出
摘要 重庆,既是山城,更是桥都。相比平原城市,重庆有着独特的、与大桥共建的轨道车站,比如大剧院站、牛角沱站、曾家岩站等,这些车站基本与大桥同期建设,并有确定的轨道制式。该文研究的桥式车站自身轨道制式具有不确定性,前期预留工程需考虑同时满足两种不同制式的包容性设计,以保证远期工程的可延续性。 Chongqing is a mountainous city, and Capital of Bridge as well. Compared to the plain city, Chongqing has unique rail stations built along with bridges, such as Grand Theater Station, Niujiao Station, Zengjiayan Station, etc. These stations were basically constructed simultaneously with the bridges and have a certain rail mode. The bridge-style stations studied in this paper have uncertain rail modes. The inclusiveness design needs to consider two different rail modes in the reserved project to ensure the continuity of the long-term project.
作者 胡庆 Hu Qing
出处 《重庆建筑》 2019年第6期60-63,共4页 Chongqing Architecture
关键词 桥式车站 轨道制式 包容性 预留工程 bridge-style station rail mode inclusiveness reserved project
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部