期刊文献+

乌江、北盘江跨流域水电站群协调优化调度系统建设与应用 被引量:1

Construction and Application of Coordination and Optimal Dispatching System for Wujiang and Beipan River Interbasin Hydropower Stations
下载PDF
导出
摘要 乌江流域、北盘江流域两大流域水电站群已初步形成,乌江集控中心、黔源库坝中心均成熟开展梯级优化调度工作,为深度挖掘水能利用率,实现跨流域优化调度,建设的跨流域水电站群协调优化调度系统,可为多方提供数据查询、分析和决策支持,促进数据和资源共享,实现调度方案多方异地会商;该系统建设为有效地协调流域间的发电目标、减少弃水提供了一种科学的解决思路和实例参考,提高了工作效率。 The hydropower stations in Wujiang River basin and Beipan River basin have been formed initially.Both Wujiang Central Control Center and Qianyuan Reservoir and Dam Center have matured to carry out cascade optimal dispatching work.In order to excavate the utilization ratio of water energy deeply,realize the optimal dispatching of interbasin,the coordinated optimal dispatching system of interbasin hydropower stations can provide data query,analysis and decision support for multi-parties,promote data and resource sharing,and realize multi-location consultation of dispatching schemes.The system provides a scientific solution and practical reference for effectively coordinating power generation objectives between river basins and reducing abandoned water,and improves work efficiency.
作者 朱明星 ZHU Mingxing(Guizhou Wujiang Hydropower Development Co.,Ltd.,Guiyang,Guizhou,550002)
出处 《红水河》 2019年第3期4-9,共6页 Hongshui River
关键词 跨流域 水电站群 优化调度 乌江 北盘江 interbasin hydropower stations optimal dispatching Wujiang River Beipan River
  • 相关文献

参考文献5

二级参考文献7

共引文献6

同被引文献29

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部