摘要
露天煤矿受征地问题、供电线路移设等因素影响,未来几个月甚至几年的生产形势无法预判,如电铲能否合理布设、供电线路如何移设、外包剥离位置是否合理、排弃空间是否充足等。编制滚动计划可以更加准确判断未来一段时间(几周、几个月、几年)的生产形势,提前提出应对措施,更加合理指导露天煤矿的生产。此外,随着采矿软件的不断研究与应用,编制滚动生产计划越来越简单、快捷、准确,可视化程度提高。
Affected by the problems like land expropriation and the relocation of power-supply lines, the production situation in the next few months or even years can't be predicted,such as whether the shovel can be reasonably arranged,how to relocate the power-supply lines,and whether the outsourcing and strip. ping position is reasonable,whether there is enough space to discard,etc. Preparing rolling plan can judge the production situation in the coming period (weeks,months,years) more accurately,and put forward the measures in advance to reasonably guide the production of open-pit mines. In addition,with the continuous study and application of mining software,preparing rolling production plan is becoming more and more sim. ple,fast,accurate and the level of visualization is improved.
作者
刘月亭
李文明
郭雁斌
LIU Yueting;LI Wenming;GUO Yanbin(Haerwusu Open-pit Mine,Haerwusu Coal Branch Company,China Shenhua,Ordos,Inner Mongolia,010300)
出处
《神华科技》
2019年第4期19-22,共4页
Shenhua Science and Technology
关键词
露天煤矿
滚动计划
软件
可视化
剥离
规划
Open-pit mine
Rolling plan
Software
Visualization
Strip
Planning