摘要
黄登水电站是国内在建(已建)的最高碾压混凝土重力坝,为解决碾压混凝土防渗漏问题、有效控制混凝土温升和提升电站的建设管理水平,引入“互联网+”的信息管理理念,研发了数字黄登·大坝施工质量管理信息化系统。通过对该系统的管理策划、项目研发、现场实施及实施效果的回顾,对项目的研究与应用进行总结,以期对国内外类似项目的实施和管理提供借鉴。
Huangdeng Hydropower Station has a highest roller compacted concrete gravity dam built in China now. In order to solve the problems of RCC leakage prevention, concrete temperature rise control and construction and management improvement of power station, the information management concept of “Internet+” is introduced, and the information management system of Huangdeng dam construction quality management is developed. Through reviewing the management planning, project development, field implementation and implementation effect of the system, the research and application of this digital system are summarized with a view to provide reference for the implementation and management of similar projects at home and abroad.
作者
郭建文
陈锐
邓拥军
GUO Jianwen;CHEN Rui;DENG Yongjun(Huaneng Lancang River Hydropower Co . , Ltd . , Kunming 650214, Yunnan, China)
出处
《水力发电》
北大核心
2019年第6期21-25,共5页
Water Power
关键词
数字系统
建设管理
黄登水电站
digital system
construction management
Huangdeng Hydropower Station