摘要
通过两种方案的设计及结构受力分析,介绍热源厂煤库采用分层整体式框架结构体系设计的方法来替代传统分离式框架结构体系和钢筋混凝土挡土墙方案,充分发挥砌体结构仅有的抗弯承载力及抗剪承载力,使分层整体式框架结构体系方案达到节约资源、降低造价、缩短施工周期的目标。该结构方案经济合理、安全可靠且施工方便,具有一定的使用价值,已在多个项目中得到验证,可推广使用。
According to the design and the structural force analysis of two schemes, this paper introduces the use of layered integral frame structure system design method to replace the scheme of traditional separated frame structure system and reinforced concrete retaining wall for the coalhole of heat source factory, which gives full play to the only flexural capacity and shear capacity of masonry structure and makes the layered integral frame structure system scheme achieve the goal of saving the resource, reducing the cost and shortening the construction period. This structural scheme is economic, reasonable, safe, reliable and convenient for construction. This scheme has a certain use value, has been verified in many projects and can be widely used.
作者
孙继鹏
王娇
张玉宝
Sun Jipeng;Wang Qiao;Zhang Yubao
出处
《城市道桥与防洪》
2019年第6期322-326,M0031,M0032,共7页
Urban Roads Bridges & Flood Control
关键词
砌体抗弯承载力
砌体抗剪承载力
钢筋混凝土
抗滑移
抗倾覆
flexural capacity of masonry structure
shear capacity of masonry structure
reinforced concrete
sliding resistance
anti-overturning