综合管廊穿越施工方案造价研究 被引量:1

Cost Study of Utility Tunnel Underneath-Cross Construction Scheme
下载PDF
导出
摘要 本文以综合管廊下穿高速公路立交桥工程为例,对综合管廊穿越常见的三种施工方案-明挖顺作、管道封闭顶进、预制管廊封闭顶进进行造价分析,为综合管廊穿越的造价提供指导。本文对影响穿越方案造价的因素进行了研究,定量分析了三种方案不同长度的造价,据此提出明挖顺作方案和顶进方案的经济平衡点观点。结果表明,当穿越长度小于经济平衡点时,明挖顺作方案造价经济;当穿越长度大于经济平衡点时,顶进方案造价经济;当穿越长度等于经济平衡点时,明挖顺作方案造价与顶进方案造价相当。经济平衡点的计算可为穿越方案的选择提供指导。 Based on an utility tunnel underneath-cross highway interchange engineering case,utility tunnel underneath-cross construction costs for open excavation method,closed pipe jacking method and closed prefabricated tunnel jacking method were analyzed to provide a guideline for utility tunnel underneath-cross costing. The influence factors for tunnel underneath-cross cost for above three methods were sought out,the costs for tunnel underneath-cross with different lengths for three methods were analyzed quantitatively,and the viewpoint of economic balance point for underneath-cross scheme was found and put forward. Results indicate that open excavation method is more economic when the underneath-cross length shorter than economic balance point;and that jacking method is more economic when the underneath-cross length longer than economic balance point;open excavation method and jacking method are economically equivalent when the underneath-cross length equal to economic balance point. Calculation method of economic balance point provides a guideline for tunnel underneath-cross scheme selection.
作者 高颖艳 李琳 姜颖 艾菁菁 张弢 GAO Ying-yan;LI Lin;JIANG Ying;AI Jing-jing;ZHANG Tao(North China Municipal Engineering Design & Research Institute Co.,Ltd.,Tianjin 300381,China)
出处 《价值工程》 2019年第18期172-179,共8页 Value Engineering
关键词 综合管廊造价 明挖顺作 管道封闭顶进 预制管廊顶进 经济平衡点 utility tunnel cost open excavation method closed pipe jacking method prefabricated tunnel jacking method economic balance point
  • 相关文献

参考文献5

二级参考文献8

共引文献92

同被引文献7

引证文献1

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部