摘要
铁路既有客站增设固定真空卸污系统是适应铁路发展的必然趋势,也是自觉落实国家环保政策的要求之所在。本文以合肥站增设固定真空卸污系统施工为例,对既有大型高速、普速共构站增设该项工程施工的重难点进行分析研究并提出相应措施。
It is an inevitable trend for railway stations to add fixed vacuum discharge system to meet the development of railway, and it is also the requirement of consciously implementing the national environmental protection policy. Taking the construction of fixed vacuum discharge system in Hefei Station as an example, this paper analyzed and studied the key and difficult points in the construction of adding this project to the existing large high-speed and general-speed co-construction station, and put forward corresponding measures.
作者
郭斌
GUO Bin(China Railway Shanghai Bureau Group Co.,Ltd. Hefei Railway Hub Project Construction Headquarters,Hefei 230022,China)
出处
《价值工程》
2019年第18期207-210,共4页
Value Engineering
关键词
真空卸污系统
既有大客站
施工
the vacuum unloading system
existing large passenger station
construction