期刊文献+

铁路大型高速普速共构车站增设固定真空卸污系统施工研究 被引量:1

Research on the Construction of Fixed Vacuum Unloading System in Railway Large-scale High-speed and General-speed Co-construction Stations
下载PDF
导出
摘要 铁路既有客站增设固定真空卸污系统是适应铁路发展的必然趋势,也是自觉落实国家环保政策的要求之所在。本文以合肥站增设固定真空卸污系统施工为例,对既有大型高速、普速共构站增设该项工程施工的重难点进行分析研究并提出相应措施。 It is an inevitable trend for railway stations to add fixed vacuum discharge system to meet the development of railway, and it is also the requirement of consciously implementing the national environmental protection policy. Taking the construction of fixed vacuum discharge system in Hefei Station as an example, this paper analyzed and studied the key and difficult points in the construction of adding this project to the existing large high-speed and general-speed co-construction station, and put forward corresponding measures.
作者 郭斌 GUO Bin(China Railway Shanghai Bureau Group Co.,Ltd. Hefei Railway Hub Project Construction Headquarters,Hefei 230022,China)
出处 《价值工程》 2019年第18期207-210,共4页 Value Engineering
关键词 真空卸污系统 既有大客站 施工 the vacuum unloading system existing large passenger station construction
  • 相关文献

同被引文献14

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部