摘要
输变电线路工程项目因技术和建设环境复杂、程资金大、工期长,它的建设具有较高风险性,加强输变电线路工程的风险评价研究,具有较大的现实意义。本文结合西南部某省的BRH双回路输变电线路工程,分析了工程建设、财务、运营和环境中的风险因素,应用层次分析法建立了输变电线路工程的风险评价体系,并进行了风险评价,最后有针对性的提出了风险防控措施。
The characteristics of power transmission line project include a large investment, a long construction period and technological complexity. Thus, the project of power transmission line construction has high hazard. It has important practical significance to research on risk assessment of transmission lines construction. In this paper, we analyzed the risk factors in the construction, finance,operation and environment based on the BRH double-circuit transmission line project in a southwest province, The risk evaluation system of transmission line project was established by AHP method, and the risk evaluation of the project was carried out. Finally, we put forward the risk prevention and control measures.
作者
叶锋
宋天立
YE Feng;SONG Tian-li(Department of Mechanical Engineering,North China Electric Power University,Baoding 071003,China)
出处
《价值工程》
2019年第18期231-234,共4页
Value Engineering
关键词
输电线路
层次分析法
风险评价
transmission line
analytic hierarchy process
risk evaluation