五阳矿硬岩巷道快速掘进钻、装、运设备选型研究 被引量:3

Study on selection of the loading equipment for fast mining in the hard strata of Wuyang Mine
下载PDF
导出
摘要 五阳煤矿7611高抽巷为硬岩巷道,巷道掘进采用了中深孔爆破技术,在掘进的过程中出现凿岩速度慢和劳动强度大的问题。为了提高7611高抽巷的掘进速度,通过实验和对比分析的方法,并结合现场地质条件,研究提出了实现7611高抽巷钻、装、运平行掘进的设备组成的机械化作业线,即钻装一体机+皮带运输机。现场应用表明,巷道掘进速度较原来有了明显提高。 7611 high pumping alley of Wuyang Mine was a hard rock roadway, the medium and deep hole blasting technology was adopted, and the problem of slow drilling speed and great labor intensity happened during mining. In order to improve the mining speed of the 7611 high pumping alley, through the method of experiment and contrastive analysis, combined with the field geological conditions, the mechanized operation line composed of drilling, installation and transportation equipment of 7611 high-pumping roadway was put forward, namely drilling and installation machine+ belt conveyer. The field application showed that the mining speed was improved obviously.
作者 常春锋 Chang Chunfeng(Wuyang Mine^ Lu an Environment Energy Development Group, Changzhi 046205, China)
出处 《煤炭与化工》 CAS 2019年第5期94-96,51,共4页 Coal and Chemical Industry
关键词 硬岩巷道 快速掘进 钻装运一体化 设备选型 hard rock roadway fast driving integrated drilling and shipping equipment selection
  • 相关文献

参考文献8

二级参考文献66

共引文献104

同被引文献16

引证文献3

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部