摘要 分析汾源煤业8114工作面距切眼700m处煤层冲刷带的实际情况,决定对冲刷带岩石进行提前掏掘形成空巷,采用锚杆索配合点柱进行支护和空巷煤柱侧围岩注浆加固方式,强化过空巷时的安全措施,实现了综采工作面顺利通过冲刷带。 Based on the analysis of the actual situation of coal seam scouring zone in 8114 working face of Fenyuan Coal Industry 700m away from the cut hole,it is decided to excavate the rock in the scouring zone ahead of time to form an empty roadway,bolt-cable support with point pillar and grouting reinforcement of surrounding rock of coal pillar side of the empty roadway should be adopted to strengthen the safety measures when passing through the empty roadway,so as to realize the smooth passage of the scouring zone in fully mechanized mining face.
作者 张忠池 Zhang Zhong-chi(Production Department of Fenyuan Coal Industry Co.,Ltd.,Huozhou Coal and Electricity Group,ShanxiHuozhou 035100)
出处 《山东煤炭科技》 2019年第6期32-33,36,共3页 Shandong Coal Science and Technology
关键词 综采 冲刷带 工艺 fully mechanized mining erosion zone technology1工程概况
  • 相关文献

参考文献5

二级参考文献31

共引文献101

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部