综放工作面沿空留巷充填墙体变形分析 被引量:4

Deformation Analysis of Filling Wall of Gob-side Entry Retaining in Fully Mechanized Topcoal Caving Face
下载PDF
导出
摘要 为提高资源回收率,东峰煤矿3G02综放工作面采用柔模混凝土沿空留巷技术进行回采留巷布置。根据留巷期间和留巷完成后的矿压观测,分析了柔模混凝土墙体和锚栓的受力状态和规律,提出针对性的改进措施。 In order to improve the recovery rate of resources,the flexible formwork concrete gob-side entry retaining technology is adopted in the 3G02 fully mechanized caving face of Dongfeng Coal Mine.According to the observation of rock pressure during and after retaining roadway,the stress state and law of flexible formwork concrete wall and anchor bolt are analyzed,and the corresponding improvement measures are put forward.
作者 原红波 Yuan Hong-bo(Dongfeng Coal Mine Co.,Ltd.,Shanxi Lanhua Coal Industry Group,Shanxi Jincheng 048000)
出处 《山东煤炭科技》 2019年第6期45-47,共3页 Shandong Coal Science and Technology
关键词 综放 沿空 墙体 分析 fully mechanized top coal caving along gob area wall analysis
  • 相关文献

参考文献3

二级参考文献10

共引文献7

同被引文献5

引证文献4

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部