基于权重系数法的输变电工程前期工作费研究

A Study on the Costs of the Earlier-Stage Work in Power Transmission and Transformation Projects Based on the Weight Coefficient Method
下载PDF
导出
摘要 为响应国家发改委和国家电网公司全面放开实行政府指导价格的建设项目专业服务费,实行市场调节机制的要求,采用权重系数法分别从分项费用、工程类型、电压等级以及不同区域4个方面对前期工作费的发生情况进行研究,对前期工作费各子项费用的重要程度进行排序,并将其与重庆地区已完工程的相关情况进行对比分析。 In response to the demands of NDRC and SGCC for government-guided pricing of professional service fee of construction projects and the market regulation mechanism,this paper studies the costs of the earlier-stage work in power transmission and transformation projects in the aspects of itemized expenses,types of projects,voltage classes and different areas based on the weight coefficient method.In addition,it introduces the importance rankings of the costs of the sub-items in the costs of the earlier-stage work as well as the comparative analysis between the rankings and relevant information of finished projects in Chongqing.
作者 刘佳 杨蕴华 余位萍 田昊 LIU Jia;YANG Yunhua;YU Weiping;TIAN Hao(State Grid Chongqing Electric Power Company,Chongqing 400014,P.R.China;Qi nan Power SupplyCompany of State Grid Chongqing Electric Power Company,Chongqing 401420,P.R.China;Economics andTechnology Research Institute of State Grid Chongqing Electric Power Company,Chongqing 401120,P.R.China)
出处 《重庆电力高等专科学校学报》 2019年第3期47-49,共3页 Journal of Chongqing Electric Power College
关键词 输变电工程 前期工作费 可行性研究费用 综合指标 权重系数法 power transmission and transformation project costs of the earlier-stage work cost of feasibility study overall indicator weight coefficient method