摘要
本文主要结合本人设计的水库大坝除险加固项目(茂名化州市长湾河水库除险加固工程、肇庆市德庆县利垌水库除险加固工程、云浮市新兴县天堂镇五二水库除险加固工程等)所采用的防渗处理措施进行简要对比分析和总结,为以后水库大坝除险加固防渗设计提供一些技术帮助。
This paper mainly combines the danger removal and reinforcement project of reservoir dam designed by me(Changwanhe Reservoir in Maoming Huazhou City, Zhaoqing County, Lidong Reservoir, Zhaoqing City). The anti-seepage treatment measures adopted in the No. 5 reservoir reinforcement project of Tiantang Town, Xinxing County, Yunfu City, are briefly compared and analyzed, which provides some technical help for the design of reservoir dam danger removal and reinforcement and seepage prevention in the future.
作者
韦伟光
Wei Weiguang(Guangdong Zhonghao Survey and Design Consulting Co.,Ltd.,Zhaoqing,Guangdong 526040)
出处
《江西建材》
2019年第6期57-57,61,共2页
Jiangxi Building Materials
关键词
水库大坝
除险加固
防渗设计
处理分析
Reservoir dam
Danger removal and reinforcement
Seepage control design
Treatment analysis