摘要
本文从顶管工程送排浆系统的三个施工控制要点介绍了泥水平衡式顶管穿越古运河杂填块石区的质量控制措施。
This paper introduces the quality control measures of mud-water balanced pipe jacking through the mixed rock filling area of ancient canal from three key points of construction control of slurry delivery and drainage system in pipe jacking project.
作者
王琦
Wang Qi(Shaanxi Construction Machinery Construction Group Co.,Ltd.,Xi'an,Shaanxi 710004)
出处
《江西建材》
2019年第6期116-117,共2页
Jiangxi Building Materials
关键词
顶管
杂填块石区
监控量测
质量控制
措施
Pipe jacking
Miscellaneous rock filling area
Monitoring and measurement
Quality control
Measures