摘要
为了保证常村煤矿地面煤流系统满足矿井最大生产能力要求,对原有矿井主煤流动筛车间进行了改造优化,解决了矿井主煤流动筛车间设备处理能力不足的问题,实现了与矿井生产的合理衔接,保证了地面煤流系统的安全运行。
In order to ensure that the ground coal flow system of Changcun Coal Mine meets the maximum production capacity requirements of the mine, the original mine main coal flow screen workshop was reconstructed and optimized, which solved the problem of insufficient processing capacity of the main coal flow screen workshop in the mine, realized the reasonable connection with mine production and ensured the safe operation of the ground coal flow system.
作者
郭绍崛
GUO Shaojue(Changcun Coal Mine, Lu'an Environmental Energy Development Co., Ltd., Changzhi 046102, Shanxi, China)
出处
《能源与节能》
2019年第6期119-120,共2页
Energy and Energy Conservation
关键词
常村煤矿
煤流系统
动筛车间
技术改造
Changcun Coal Mine
coal flow system
moving screen workshop
technical transformation