期刊文献+

民用飞机结构非计划直接维修成本预计研究 被引量:4

Study on Unscheduled Direct Maintenance Cost of Civil Aircraft Structure
下载PDF
导出
摘要 民用飞机结构非计划直接维修成本在设计阶段难以预计。介绍DMC构成要素及影响因素,建立DMC预计流程、预计模型及预计调整模型;以前中机身上蒙皮壁板为例,基于工程设计输入及统计报告,计算来自MSG-3,DTA,DSEA的非计划维修任务DMC数值,对比并分析金属及复合材料非计划DMC预计结果。结果表明:该预计方法可行,反映预计模型准确性,金属结构环境退化及疲劳损伤是影响该结构DMC的主要因素,复合材料的使用可显著降低飞机结构非计划DMC。 To solve the problem of the unscheduled direct maintenance cost of civil aircraft structure is difficult to predict in the design phase.The elements and influence factors of DMC are introduced,and the prediction flow,model and adjustment model are established.Based on engineering design inputs and statistical reports,an example about a skin panel of forward-mid fuselage is presented.A series of DMC values of the maintenance tasks from MSG-3,DTA and DSEA analysis are computed,and the various DMC prediction results for metal and composite skin panel are compared and analyzed.The feasibility of the prediction method is verified,and the accuracy of the prediction model is reflected.It is shown that environment damage(ED)and fatigue damage(FD)are the main factors affecting the DMC of the metal structure,and the application of composite materials can significantly reduce the unscheduled DMC.
作者 刘余 刘昕 张继斌 刘成 谭宏斌 Liu Yu;Liu Xin;Zhang Jibin;Liu Cheng;Tan Hongbin(Engineering Research & Development Center,AVIC SAC Commercial Aircraft Co.,Ltd.,Shenyang 110169,China;Maintenance Engineering Department,COMAC Shanghai Aircraft Customer Service Co.,Ltd.,Shanghai 200241,China)
出处 《航空工程进展》 CSCD 2019年第3期407-412,422,共7页 Advances in Aeronautical Science and Engineering
关键词 民用飞机 直接维修成本 预计模型 环境退化 疲劳损伤 特殊事件 非计划维修 civil aircraft DMC prediction model ED FD special event unscheduled maintenance
  • 相关文献

参考文献4

二级参考文献19

  • 1梁宪珠,张铖.浅谈降低国内航空复合材料结构成本的途径[J].航空制造技术,2011,54(3):40-44. 被引量:18
  • 2张九渊,洪明庚,卢建树,蔡鹏.孔蚀统计规律的对比研究[J].中国腐蚀与防护学报,1994,14(2):161-167. 被引量:19
  • 3吴静敏,左洪福.基于案例推理的直接维修成本预计方法[J].航空学报,2005,26(2):190-194. 被引量:20
  • 4刘凤岭 中国腐蚀与防护学会.腐蚀科学与防腐工程技术新进展[M].北京:化学工业出版社,1999.570-573.
  • 5American Airlines. A new method for estimating current and future transport aircraft operating economics [R]. NASA CR-145190, 1978.
  • 6Liao T W, Zhang Z. Similarity measures for retrieval in case-based reasoning systems[J]. Applied Artificial Intelligence, 1998(12): 267-288.
  • 7Wilson D R, Martinez T R. Improved heterogeneous distance functions[J]. Journal of Artificial Intelligence Research, 1997(6): 1-34.
  • 8Aha D W.Feature weighting for lazy learning algorithms[R]. Technical Report AIC-98-003, Washington DC: Naval Research Laboratory, Navy Center for Applied Research in Artificial Intelligence, 1998.
  • 9Wilke W, Bergmann R. Techniques and knowledge used for adaptation during case-based problem solving [A]. In: Angel P, Del P, José M Moonis Ali. Tasks and Methods in Applied Artificial Intelligence[C]. Castellón, Spain: IEA/AIE, 1998. 497-506.
  • 10Poubeau J. Direct maintenance costs-art or science [M]. Blagnac Cedex, France: Airbus Industrie, 1989.

共引文献48

同被引文献32

引证文献4

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部