中交汇通横琴广场超高层建筑机电施工重难点分析及对策 被引量:4

Analysis and countermeasures of heavy and difficult points in MEP construction of super-high-rise building of CCCC Hengqin Huitong Financial World
下载PDF
导出
摘要 中交汇通横琴广场项目属于超高层建筑,机电施工具有工作量大、交叉作业多、施工技术难度大、技术质量要求高等特点。文章结合项目的施工管理经验,从技术和管理方面综合叙述了中交汇通横琴广场超高层建筑机电施工技术中遇到的重点、难点问题,并提出了相应的对策。 CCCC Hengqin Huitong Financial World project belongs to a super-high-rise building, MEP construction has the characteristics of large workload, more cross-over work, difficult construction technology and high technical quality requirements. Combined with the construction management experience of the project, we comprehensively described the key points and difficult problems encountered in the MEP construction technology of the super -high -rise building of CCCC Hengqin Huitong Financial World from the aspects of technology and management, and puts forward the corresponding countermeasures.
作者 郭彦禄 范广颢 李晓冬 GUO Yan-lu;FAN Guang-hao;LI Xiao-dong(Installation Engineering Co., Ltd. of CCCC First Harbor Engineering Co., Ltd., Tianjin 300457, China;No.4 Engineering Co., Ltd. of CCCC First Harbor Engineering Co., Ltd., Tianjin 300456, China)
出处 《中国港湾建设》 2019年第7期90-92,共3页 China Harbour Engineering
关键词 横琴广场 超高层建筑 机电施工 对策 Hengqin Huitong Financial World super-high-rise building MEP construction countermeasures
  • 相关文献

参考文献6

二级参考文献16

共引文献10

同被引文献10

引证文献4

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部