期刊文献+

有轨电车路口综合控制系统方案研究 被引量:2

Scheme Research on Integrated Control System of Tram Intersection
下载PDF
导出
摘要 详细介绍了有轨电车信号系统与智能交通信号系统在平交道口的同步智能控制、优先机理以及响应等级,分析了平交路口综合控制系统方案,提出了平交路口信号系统和智能交通信号系统的设备构成及工作原理,论述了平交路口在智能控制下延长绿灯、缩短红灯、插入相位等控制策略,以增加平交路口的通过量。 This paper introduces the synchronous intelligent control,priority mechanism and response level of tram signal system and intelligent traffic signal system at level-crossing in detail,analyzes the integrated control system scheme of the level intersection,and puts forward the equipment composition and working principle of the signal system and intelligent traffic signal system of the level intersection,discusses the control strategies of lengthening green light,shortening red light and inserting phase under the intelligent control,so as to increase the amount of crossing.
作者 聂元凯 NIE Yuan-kai(The 2nd Engineering Co.Ltd.of China Railway Construction Electrification Bureau Group,Taiyuan 030023,China)
出处 《工程建设与设计》 2019年第12期71-73,90,共4页 Construction & Design for Engineering
关键词 运营调度 联锁 信号优先控制 相位 operation scheduling interlock signal priority control phase
  • 相关文献

同被引文献11

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部