期刊文献+

厄瓜多尔Tambococha油田岩屑回注技术分析与应用 被引量:5

ANALYSIS AND APPLICATION OF CUTTINGS REINJECTION TECHNOLOGY IN TAMBOCOCHA OILFIELD,ECUADOR
下载PDF
导出
摘要 随着石油行业环保意识的增强和环保标准的提高,岩屑处理成为各大油田面临的一大难题,岩屑回注技术是较为可靠的解决方案之一,可实现钻井现场零排放。根据地震和测井数据分析,NAPO-T层砂岩发育良好且无油气显示,上下层均为页岩层,满足地质隔离要求,适合选做岩屑回注层。TMBD-00XD井是厄瓜多尔Tambococha油田完钻的第一口井,为“S”型三开井身结构,井深1 816.6 m,最大井斜14.5°,承担着该区块全部钻屑和废弃钻井液的回注任务。该井自启动岩屑回注工作以来,已累计回注岩屑和废液近1.1×10^5 m^3,满足两部钻机同时作业产生的岩屑的回注要求,彻底处理了岩屑和废液,避免了二次损害,且处理成本低,在高环境敏感地区有着良好的推广应用前景。 With the enhanced environmental awareness in the petroleum industry and the more highly required environmental protection standards,cuttings disposal has become a major problem facing major oil fields.The cuttings reinjection technology is one of the more reliable solutions,which can achieve zero emission at the drilling site.According to the analysis of seismic and logging data,the NAPO-T layer sandstone is well developed and has no oil and gas show.The upper and lower layers are shale layers,which meet the geological isolation requirements and are suitable for the cuttings reinjection layer.The TMBD-002D well is the first well drilled in the Tambococha oil field in Ecuador.It is an“S”type three-spud well structure with a depth of 1816.6 meters and a maximum well inclination of 14.5°.It is used as reinjection zone for all the cuttings and abandoned drilling fluid in the block.Since the start of the cuttings reinjection work,the well has accumulated nearly 1.1×10^5 m^3 of reclaimed cuttings and waste liquid,meeting the cuttings reinjection requirements of two rigs at the same time,the cuttings and waste liquid thoroughly disposed,the secondary pollution avoided,at a low cost.It has a good promotion prospect in highly environmentally sensitive areas.
作者 蒋振伟 李宝军 张建斌 JIANG Zhenwei;LI Baojun;ZHANG Jianbin(National Engineering Laboratory for Exploration and Development of Low Permeability Oil and Gas Fields,Xi’an,Shanxi 710018,China;Drilling and Production Engineering Technology Research Institute,CNPC Chuanqing Drilling Engineering Company Limited,Xi’an,Shanxi 710018,China)
出处 《钻采工艺》 CAS 北大核心 2019年第3期27-30,I0002,共5页 Drilling & Production Technology
关键词 Tambococha油田 岩屑回注 零排放 环境保护 Tambococha oil field cuttings reinjection zero emission environmental protection
  • 相关文献

参考文献4

二级参考文献99

  • 1Schumacher J P, EMalachosky D M Lantero and Hamilton P D, Minimisation and Recycling of Drilling Waste on the Alaskan North Slope[J]. SPE 20428, JPT June 1991, pp 722 - 729.
  • 2Veil J A and Dusseault M B. Evaluation of Slurry Injection Technology for Management of Drilling Wastes [ R ]. U.S. Department of Energy National Petroleum Technology Office under Contract W - 31 - 109 - Eng - 38, 2003.
  • 3OSPAR Commission 2006 [ R ]. Overview of OSPAR Assessme- nts, 1998 - 2006.
  • 4Minton R C and B Secoy. Annular Re - injection of DriUi - ng Wastes[J]. SPE 25042, Cannes, France, November 16 - 18,1992.
  • 5E&P Forum. Exploration and Production (E% P) Waste Man - agement Guidelines[R]. Report No. 2.58/196, September 1993.
  • 6Moschovidis Z A, Gardner D C, Sund G V, etal. Disposal of Oily Cuttings by Downhole Periodic Fracturing Injections in Valhall - North Sea: A Case Study and Modelling Concepts [ J ]. SPE/IADC25757, SPE/IADC Drilling Conference, Amsterdam, February, 1993.
  • 7Technical Report. Offshore Drilling Waste Management Rev - iew [ R ]. Canadian Association of Petroleum Producers, February 2001.
  • 8Guo Q, and Geehan T, An Overview of Drill Cuttings Re - Injection - Lessons Learned and Recommendations [ R]. 11th International Petroleum Environmental Conference Albuquerque, New Mexico, October 12 -15, 2004.
  • 9Bruno M S, Bflak R A , Dusseault M B, etaL Economic Disposal of Solid Off Field Wastes Through Slurry Fracture injection[J]. SPE 29646, CA, USA, March 8-10 1995.
  • 10l_owe D J. NORM Cleaning and Disposal Using Closed- Loop Hydroblasting or Solvent Bath and Underground Injecti- on System[J]. SPE 25935, San Antonio, TX, March 1993.

共引文献44

同被引文献70

引证文献5

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部