期刊文献+

Nam Dik 2水电站大坝坝型设计方案选择 被引量:1

Scheme Selection of Dam Type Design of Nam Dik 2 Hydropower Station
下载PDF
导出
摘要 本文根据坝后式电站特点,充分利用利用坝址区地形地质条件,对电站大坝设计进行各种方案的技术、经济比较,最终确定了坝型,使其在满足工程安全和功能要求的条件下,同时又能够节省工程投资并有利于施工。因此,水电站坝型的选择不仅要满足安全和使用功能的要求,而且还要从施工条件、投资、工期及环境保护等诸多方面进行综合考虑。 According to the characteristics of the dam-rear power station, and making full use of the topographic and geological conditions of the dam site area, this paper makes technical and economic comparison of various dam design schemes, and finally determines the dam type which has met the safety and functional requirements of the project as well as saved the investment of the project and facilitated the construction. Therefore, the selection of dam type of hydropower station should not only meet the requirements of safety and use function, but also need comprehensive consideration of construction conditions, investment, construction duration and environmental protection.
作者 岳亮 黄开江 YUE Liang;HUANG Kaijiang(Survey and Design Institute of Sinohydro Bureau 10 Co., LTD, Chengdu, Sichuan, 610072)
出处 《四川水力发电》 2019年第3期87-90,共4页 Sichuan Hydropower
关键词 重力坝 堆石坝 研究思路 方案比较 gravity dam rock-fill dam research approach scheme comparison
  • 相关文献

同被引文献4

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部