摘要 广西德保县隆桑镇坡纳屯~陇串村排涝渠(隧洞)修复工程由5段排涝明渠和5个排涝隧洞组成,工程区岩溶发育,岩溶塌陷、落水洞发育,水文地质条件复杂。分析了该工程的综合水文地质条件、地形地貌及岩土物理学特性,结合工程实际对排涝渠(隧洞)工程地质条件进行评价,针对出现的工程地质问题,提出相应的处理建议。 Located at Longsang Town, Debao county of Guangxi, the Ponatun-Longchuan village drain canal (tunnel) repairing project consists of five open canal sections and five tunnels. The project area is characterized by karst developed and collapse, developed sink-holes, complex hydrological and geological conditions. The author analyzed the comprehensive hydrological and geological conditions, topography, landform, geotechnical physics characteristics of the project, evaluated the engineering geological conditions, and put forward treatment suggestions for the geological problems.
作者 黄宇 HUANG Yu(Guangxi Water and Power Design Institute, Nanning 530023, China)
出处 《广西水利水电》 2019年第3期9-14,共6页 Guangxi Water Resources & Hydropower Engineering
关键词 岩溶 地下河 隧洞 红黏土 工程地质条件 坡纳屯~陇串村排涝渠 Karst ground river tunnel red clay engineering geological condition Ponatun-Longchuan village drain canal
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部