摘要
广西德保县隆桑镇坡纳屯~陇串村排涝渠(隧洞)修复工程由5段排涝明渠和5个排涝隧洞组成,工程区岩溶发育,岩溶塌陷、落水洞发育,水文地质条件复杂。分析了该工程的综合水文地质条件、地形地貌及岩土物理学特性,结合工程实际对排涝渠(隧洞)工程地质条件进行评价,针对出现的工程地质问题,提出相应的处理建议。
Located at Longsang Town, Debao county of Guangxi, the Ponatun-Longchuan village drain canal (tunnel) repairing project consists of five open canal sections and five tunnels. The project area is characterized by karst developed and collapse, developed sink-holes, complex hydrological and geological conditions. The author analyzed the comprehensive hydrological and geological conditions, topography, landform, geotechnical physics characteristics of the project, evaluated the engineering geological conditions, and put forward treatment suggestions for the geological problems.
作者
黄宇
HUANG Yu(Guangxi Water and Power Design Institute, Nanning 530023, China)
出处
《广西水利水电》
2019年第3期9-14,共6页
Guangxi Water Resources & Hydropower Engineering
关键词
岩溶
地下河
隧洞
红黏土
工程地质条件
坡纳屯~陇串村排涝渠
Karst
ground river
tunnel
red clay
engineering geological condition
Ponatun-Longchuan village drain canal