结合右江流域汛末来水预报,选择相似典型年,提出考虑来水预报下的百色水利枢纽汛末蓄水方案,研究抬高汛末水库蓄水位的可能性,并分析蓄水方案的风险与效益,为百色水利枢纽充分利用水资源提供参考。
For Baise Multipurpose Dam Project, combined with the Youjiang River basin inflow forecast at the end of flood season, similar typical years were chosen to study the possibility of raising the reservoir water level, put forward the reservoir water storage scheme at the end of flood season taking into account inflow forecast, analyze the risk and benefits of water storage scheme, so as to provide reference for fully utilization of water resources.
作者
叶飞武
蒋华波
YE Fei-wu;JIANG Hua-bo(Guangxi Water and Power Design Institute, Nanning 530023, China)
出处
《广西水利水电》
2019年第3期41-43,共3页
Guangxi Water Resources & Hydropower Engineering
关键词
汛末
来水预报
蓄水方案
风险与效益
百色水利枢纽
At the end of flood season
inflow forecast
impounding scheme
risk and benefit
Baise Multipurpose Dam Project