摘要
近年来,我国的海洋工程装备制造越来越多。为了满足海洋工程高端装备制造与装配过程中对宏观测量大尺寸和局部细节高精度的双重要求,提出了一种构建全局控制网络并优化转站测量海洋工程精度的方法,分析其影响转站精度的因子。试验证明,实测结果与仿真数据具有较好的一致性。
In recent years, more and more offshore engineering equipment are manufactured in China. In order to satisfy the double requirements of macro measurement of large size and high precision of local details in the manufacturing and assembling process of high-end marine engineering equipment, a method of constructing global control network and optimizing the accuracy of transfer station measurement in offshore engineering is proposed, and the factors affecting the accuracy of transfer station are analyzed. Experimental results show that the measured results are in good agreement with the simulated data.
作者
陆军
邓达纮
张静波
LU Jun;DENG Dahong;ZHANG Jingbo(Keen Offshore Engineering Co.,Ltd.Foshan 528241)
出处
《广东造船》
2019年第3期52-54,共3页
Guangdong shipbuilding
关键词
海洋工程
制造精度
组网测量
坐标转换
ocean engineering
manufacturing accuracy
networking measurement
coordinate transformation