SPM系统在分段建造计划编制和进度控制中的应用

Application of SPM System in Blocks Construction Planning and Schedule Control
下载PDF
导出
摘要 船舶分段建造周期较长,涉及的影响因素较多。本文通过分析分段建造的影响因素,利用造船生产管理系统(简称SPM系统),编制一份合理、准确的分段建造日程计划,对分段建造进度全面进行控制,有效地提高了分段建造计划编制和进度控制管理水平。 The construction period of ship block is relatively long and involves many influencing factors. Based on the analysis of the influencing factors in block construction and the use of the Shipbuilding production Management system (SPM system for short), a reasonable and accurate schedule of block construction is compiled, the progress of block construction can be effectively controlled and the level of block construction planning and progress control and management will be improved.
作者 沃周华 WO Zhouhua(Hudong-Zhonghua Shipbuilding (Group) Co.,Ltd.Shanghai 200129)
出处 《广东造船》 2019年第3期90-92,共3页 Guangdong shipbuilding
关键词 分段建造 计划编制 进度控制 计划系统 block construction establish plans schedule control planning system
  • 相关文献

参考文献4

共引文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部