摘要 膨胀性软岩巷道底鼓防治是软岩巷道支护中的一项技术难题。陕西彬长矿区大佛寺矿402采区水仓底板为铝质泥岩,支护困难,在对巷道底板破坏机理进行分析的基础上,提出了底角锚杆+钢筋混凝土反拱支护方案,在大佛寺矿实践中取得了良好的支护效果,为膨胀性软岩巷道底鼓防治提供了宝贵的经验。 The prevention and control of bulging soft rock roadway bottom drum is a technical problem in soft rock roadway support. Based on the analysis of the damage mechanism of the roadway floor, Puts forward the scheme of floor corner bolt + reinforced concrete anti-arch support, which has obtained a good support effect in the practice of the Shaanxi Binchang Dafosi mine. It provides valuable experience for the prevention and control of bottom drum of soft rock tunnel.
作者 王建辉 亢晓涛 汪海平 WANG Jian-hui;KANG Xiao-tao;WANG Hai-ping(Shaanxi Binchang Mining Co., Ltd., Binxian 713500, China)
出处 《煤炭技术》 CAS 2019年第6期60-62,共3页 Coal Technology
关键词 膨胀性软岩 底鼓 底角锚杆 钢筋混凝土反拱 expansive soft rock floor heave floor corner bolt reinforced concrete anti-arch
  • 相关文献

参考文献1

二级参考文献3

  • 1王洪立,王玉白,胡冠英.巷道底臌的原因及防治措施[J].煤矿安全,2005,36(8):43-45. 被引量:17
  • 2Chen H J. Stress Analysis in Longwall Entry Roof Under High Horizontal Stress [ D]. Morgantown: West Virginia University, 1999: 278.
  • 3刘文涛,何满潮,杨生彬,等.深部岩巷不对称变形机理及支护对策研究[c]//第九届岩石力学与工程学术大会论文集.北京:科学出版社,2006:661-669.

共引文献8

同被引文献31

引证文献6

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部