5Fu Zhongqiu, Ji Bohai, Zhao Duanduan, et al.Corro- sion evaluation of the steel material on steel box girder bridge by comprehensive scoring method[J]. Materials Research Innovations,2014,18($2) .. 710 -- 714.
6Ya S, Yamada K, Ishikawa T. Fatigue evaluation of rib-to-deck welded joints of orthotropic steel bridge deck[J]].Journal of Bridge Engineering, 2010,16 (4) :492--499.
7Wang C S, Feng Y C, Duan L.Fatigue damage evalua- tion and retrofit of steel orthotropic bridge decks[J]. Key Engineering Materials, 2009,413 : 741 -- 748.
8Liu Rong, Liu Yuqing,Ji Bohai, et al. Hot spot stress analysis on rib-deck welded joint in orthotropic steel decks[J].Journal of Constructional Steel Research, 2014,97(2) .. 1 --9.
9GB/T 10433-2002. 电弧螺柱焊用圆柱头焊钉(S)2002
10Richard P, Cheyrezy M. Composition of reactive powderconcretes[J] . Cement and Concrete Research, 1995, 25(7) : 1501-1511.