摘要
本文结合天津港既有散货码头的两种装卸工艺模式,基于进口矿石直装火车的技术可行性,提出了5种改造方案,并进行简要的优劣分析,同时总结了影响矿石直装火车的多种适应因素,为后续类似工程提供参考与借鉴。
Based on the technical feasibility of directly loading process of Ship-to-Train for imported ore, this paper puts forward five reformation schemes combined with two handling technology modes of existing bulk cargo terminal in Tianjin Port, and makes a brief analysis of their advantages and disadvantages. At the same time, it summarizes the various adaptable factors affecting ore Direct-Loading train, which can provide reference for similar projects.
作者
魏梦娇
郭建睿
Wei Mengjiao;Guo Jianrui(CCCC First Harbor Consultants Co., Ltd., Tianjin 300222, China)
出处
《港工技术》
2019年第B06期38-41,共4页
Port Engineering Technology
关键词
进口散货矿石
直装火车
工艺方案
研究分析
imported bulk ore
directly loading process of ship-to-train
handling technology
research and analysis