海上风电场建设施工期风险点的识别与控制 被引量:4

Identification and Control of Risk Points in Offshore Wind Farm Construction
下载PDF
导出
摘要 在我国海上风电产业发展过程中,建设施工环节的风险最大。中国船级社以自身积累的海工经验和技术,通过HAZID/HAZOP分析的方式,对海上风电建设施工期中各个环节进行了风险点的识别与控制。文章以海上升压站为例,归纳了施工过程中的“非常高风险”点和相应的“控制措施”,希望可以对提高我国海上风电建设施工期的安全性有所帮助。 During the development of China's offshore wind power industry, the risk of construction is the highest. With its accumulated marine engineering experience and technology, China Classification Society identifies and controls the risk points of each link during the construction of offshore wind power through HAZID/HAZOP analysis. The offshore substation is taken as an example to summarize the "very high risk" and the corresponding "control measures" in the construction process, hoping to provide some help for the safety of China's offshore wind farm during the construction period.
作者 纪宁毅 尹杰 JI Ningyi;YIN Jie(Nanjing Branch, China Classification Society Certification Ltd., Nanjing 210011, Jiangsu, China)
出处 《机电设备》 2019年第3期40-43,共4页 Mechanical and Electrical Equipment
关键词 海上风电场 建设施工 海上升压站 HAZID HAZOP offshore wind farm construction substation HAZID HAZOP
  • 相关文献

同被引文献13

引证文献4

二级引证文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部