摘要
地铁隧道施工采用盾构法施工时,衬砌一般采用钢筋混凝土管片,为了满足成型隧道的施工质量,需对管片进行材料粘贴,达到防止管片破损及接缝漏水的目的。结合实际施工中的施工经验,对钢筋混凝土管片材料粘贴的施工工艺及常见问题的处理措施进行总结。
In the construction of the subway tunnel, the lining is usually made of reinforced concrete segments. In order to meet the construction quality of the forming tunnel, the segment shall be pasted to the purpose of preventing the segment from being damaged and the seam is leaking. Based on the construction experience in the construction, the construction technology and the treatment measures of the common problems of the reinforced concrete segment material are summarized.
作者
范蔚山
FAN Weishan(China Jiaotong No.1 Public Bureau Group Co., Ltd., Beijing, 101102 China)
出处
《工程建设(维泽科技)》
2019年第6期132-136,共5页
Engineering Construction
关键词
地铁隧道
管片
材料粘贴
施工工艺
处理措施
Metro tunnel
Segment
Material paste
Construction technology
Treatment measures