海上风电场联合送出优化方案研究 被引量:3

Research on Offshore Wind Farm Optimization Scheme for Joint Delivery
下载PDF
导出
摘要 [目的]结合我国广东地区海上风电场布置及典型送出方案,对两个300MW风电场联合送出的方案进行了探讨。[方法]在电气主接线、海缆选型、可靠性分析、海缆敷设与供货、可比投资等方面进行了分析比较。[结果]最终得出联合风场送出的优化方案,即设2座220kV海上升压站+1座陆上集控中心,其中1座升压站通过1回3×1000mm^2海缆接至另1座升压站GIS,汇流后再通过2回3×1000mm^2海缆一并送出至陆上集控中心。[结论]联合送出的优化方案可大大节省投资并减少用海面积,可为后续海上风电场电气设计提供参考。 [Introduction] According to the offshore wind farms layout and typical delivery scheme of Guangdong area,the paper discusses the two joint delivery schemes of 300 MW offshore wind farm.[Method] From the aspects of electrical single line diagram,submarined cable′s selection,reliability analysis,cable laying and supply,comparable investment and so on were compared.[Result] To provide an optimization for the joint delivery of offshore wind farm,setting two 220 kV offshore booster station and one onshore control center,one of the booster station connect to another with one 3×1 000mm^2 submarine cable,then sent out with two 3×1000mm^2 submarine cable to onshore control center.[Conclusion] The scheme of two joint delivery schemes of 300 MW offshore wind farm can save the investment and reduce the area of sea which offers reference for the prospective electrical design of offshore wind farm.
作者 常胜 李炬添 张振 沈云 王海龙 CHANG Sheng;LI Jutian;ZHANG Zhen;SHEN Yun;WANG Hailong(SPIC Guangdong Electric Power Co.,Ltd.,Guangzhou 510130,China;China Energy Engineering Group Guangdong Electric Power Design Institute Co.,Ltd.,Guangzhou 510663,China)
出处 《南方能源建设》 2019年第2期49-53,共5页 Southern Energy Construction
基金 中国能建广东院科技项目“海上风电场电气系统关键技术及电气设计”(EV02861W)
关键词 海上风电场 联合送出 征海 载流量 offshore wind farm joint delivery levy sea current carrying capacity
  • 相关文献

参考文献5

二级参考文献56

共引文献55

同被引文献27

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部