期刊文献+

基于遗传算法的钢板罩退工序生产调度优化

Scheduling Problem of Sheet Plant’s bell annealing Based on Genetic Algorithms
下载PDF
导出
摘要 针对钢铁薄板生产瓶颈工序,建立基于设备约束、产品约束、时间约束和批次约束数学模型,通过遗传算法寻优计算,得到较优可行解。结果显示,工序订单完成时间较实际生产时间减少,并且随着订单规模的增加,优化效果更加明显,但达到一定程度后趋于稳定。研究结果为薄板生产中罩退工序的调度问题优化提供了新思路、新方法,能够帮助企业有效提升生产效率和经济效益。 Aiming at the bottleneck process of steel sheet production, a mathematical model based on equipment constraints, product constraints, time constraints and batch constraints was established, through genetic algorithm optimization calculation, the better feasible solution is obtained. The results show that the weighted completion time is better than the corresponding actual production scheduling results, and with the increase of the scale of the problem, the superiority is more obvious. The research results provide a new idea and method for the scheduling optimization of the bell annealing process of Sheet Plant, which can help enterprises effectively improve production efficiency and economic benefits.
作者 付豫金 袁林艳 FU Yu-jin;YUAN Lin-yan(China Air-to-Air Missile Research Institute,Luoyang Henan 471000, China;Tanggu Zhejiang Road Primary School, Binhai New Area,Tianjin 300450, China)
出处 《装备制造技术》 2019年第5期226-230,共5页 Equipment Manufacturing Technology
关键词 钢板罩退 遗传算法 生产调度 bell annealing of sheet plant genetic algorithm production scheduling
  • 相关文献

参考文献2

二级参考文献17

  • 1AGNIHOTHRI S, SIVASUBRAMANIAM N, SIMMONS D. Leveraging technology to improve field service[J]. Inter- national Journal of Service Industry Management, 2002, 13 (1) :47-68.
  • 2TANG Q, WILSON S R, PEREVALOV E. An approxima- tion manpower planning model for after-sales field service sup- port[J]. Computers & Operations Research, 2007, DOI: 10. 1016/j. eor. 2007. 01. 022.
  • 3CARAMIA M, GIORDANI S. A new approach for scheduling independent tasks with multiple modes[J]. Journal of Heuris- tics, 2009,15(4) : 313-329.
  • 4BELLENGUEZ-MORINEAU O, NERON E. A branch-and- bound method for solving multi-skill project scheduling prob- lem[J]. RAIRO-Operations Research, 2007,41 (2) : 155-170.
  • 5HAUGEN D L, HILL A V. Scheduling to improve field service quality[J]. Decision Science, 1992,23 (1) : 235-249.
  • 6HILL A V. An experimental comparison of dispatching rules for field service support [J]. Decision Sciences, 1992,23 ( 1 ) : 235-249.
  • 7BELLENGUEZ O, NERON E. Lower hounds for the multi-skill project scheduling prohlem with hierarchical levels of skills[J]. Lecture Notes in Computer Science,2005,3616:229-243.
  • 8OMBUKI B, ROSS B J, HANSHAR F. Multi-objective ge- netic algorithms for vehicle routing problem with time win- dows[J]. Applied Inteligence, 2006,24(1) : 17-30.
  • 9CARTER A E, RAGSDALE C T. A new approach to sol- ving the multiple traveling salesperson problem using genetic algorithms[J]. European Journal of Operational Research, 2006,175(1) : 246-257.
  • 10王建宇,周春光,郭东伟,马彧.基于Rank的进化算法解决多目标TSP问题[J].计算机工程与科学,2008,30(2):75-77. 被引量:2

共引文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部