摘要
分析了D-B项目的特点及承包商如何据此开展设计工作,探讨了设计代表、技术会议、工程师意见、风险规避等方面的问题。
The characteristics of D-B project were analyzed.And based on these characteristics,how to carry on designing works for contractor were analyzed.Besides,representative of the designer,technologic meeting,engineer's opinions and risk avoidance were disscussed in this paper.
作者
张志明
ZHANG Zhi-ming(Power China Harbour Co. Ltd.,Tianjin 300456,China)
出处
《工程建设与设计》
2019年第13期274-277,共4页
Construction & Design for Engineering
关键词
D-B项目
承包商
设计工作
设计代表
风险
D-B project
contractor
designing work
representative of the designer
risk