期刊文献+

公路工程施工进度管理中存在的问题及其对策分析 被引量:7

Analysis of Problems and the Countermeasures in Construction Schedule Management of Highway Engineering
下载PDF
导出
摘要 公路工程施工过程中,对于进度的管理需要在计划、执行、检查、分析、调整等多个动态过程中进行循环。做好施工进度计划的衔接,对现场施工进度计划的落实情况进行跟踪监督,结合现场施工需求及实际情况进行必要调整,从而确保工程建设目标的实现。论文阐述了公路工程施工进度管理工作的重要性,分析了公路工程施工进度管理中存在的问题及其对策。 In the process ofhighway engineering construction,schedule management needs to be circulated in many dynamic processes such as planning,execution,inspection,analysis and adjustment.Doing a good job of linking up the construction progress plan,tracking and supervising the implementation of the site construction progress plan,and making necessary adjustments according to the site construction demand and actual situation can ensure the realization of the construction objectives.This paper expounds the importance of highway engineering construction progress management,and analyzes the problems and countermeasures in highway engineering construction progress management.
作者 郭国忠 GUO Guo-zhong(Xingtai Road & Bridge Construction Corporation,Xingtai 054001,China)
出处 《工程建设与设计》 2019年第13期293-294,297,共3页 Construction & Design for Engineering
关键词 公路工程 施工进度 管理 问题 对策 highway engineering construction schedule management problems countermeasures
  • 相关文献

参考文献3

二级参考文献10

共引文献18

引证文献7

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部